Member Advocacy Prompts City Review of Elevator Hoistway Smoke Protection

Posted By: Laura Diaz Advocacy,

Advocacy Day Delivers Results

When Houston BOMA members joined us at City Hall Advocacy Day on August 19, 2026, elevator hoistway smoke protection was at the top of their conversations with city leaders. Those conversations are now paying off.

Houston Public Works has completed a technical review of the issue and issued a memorandum on how renovations to existing buildings should be evaluated.

“I think this is meaningful progress,” said Bradley Elliott, CEO at Houston BOMA. “The City has acknowledged the underlying issue and provided a much clearer interpretation of how existing-building renovations should be evaluated.”


What the City Clarified

The memorandum includes several findings that matter for members planning renovations:

  • No automatic renovation trigger: Renovating more than 50% of an individual floor does not, by itself, trigger current IBC Section 3006 elevator hoistway smoke protection requirements.
  • Distinction between code provisions: The IEBC's requirements for existing vertical openings and shaft enclosures are separate from the smoke-protection requirements of IBC Section 3006. Meeting a threshold under one does not automatically trigger the other.
  • Code of record matters: Buildings with lawfully approved existing elevator configurations are not automatically required to meet current new-construction standards simply because renovations occur.
  • Specific code justification required: Any required upgrade must be supported by an applicable, enforceable code provision or documented unsafe-condition authority. The size of a renovation alone is not sufficient justification.
  • Elevator classifications matter: The City clarified that the more stringent requirements for fire service access elevators under IBC Section 3007 should not automatically be applied to general passenger elevators.
  • Existing smoke-control systems: Engineering analysis may help document existing conditions, but an engineer's letter alone does not waive an otherwise applicable code requirement. Alternative systems must go through the appropriate approval process.

What Comes Next

For now, the City plans to review each renovation project on a case by case basis, and any required upgrade will need to be backed by a specific code requirement. The City may also put this process in writing so that the staff who review plans and inspect buildings apply it consistently. “This is a significant step toward resolving an issue our members have been navigating for some time,” said Elliott.

Longer term, the City recommends updating Houston's building code for existing buildings so it spells out exactly when a renovation requires added elevator smoke protection. The City plans to work directly with Houston BOMA, property owners, design professionals, and others. We will keep members updated as this work moves forward.


Thank You to Our Members

This progress is a direct result of our members showing up at City Hall and raising this issue with city leaders. Thank you to everyone who participated in Advocacy Day and lent their voice to this effort. When our members speak up together, it makes a real difference for the entire Houston commercial real estate community. This is BOMA advocacy in action!